Here are some recently completed additions and upgrades to our processing capabilities:
2019 - New High-Efficiency Rincing box and Recoiler on the Pickling Line
2020 - Launch of own trucking operations
2021 - Infrastructure upgrades: 22,000-gallon acid tank, 35-ton receiving crane, building addition, coil storage systems, climate control systems
2022 - New Braner Ultra-High Strength High-Precision Slitting coupled with Automated Packaging Line
2022 - New Automated coil preparation and entry line in pickling
2023 - Pickling Line Upgrades: New high-efficiency strip drying system in pickling, New ISRA Parsytec surface inspection system, Turbo Circulation, Automated Steering
2023 - Slitting Upgrades: Third Braner slitting head, New Stamco Drives
2024 - New High-Efficiency Peabody Oiler on Pickling Line (Q2 2024)
2024 - Pickling Line Speed Increase to 500 FPM